What permits do you need to build a pool?

Construction of swimming pools

Yes: a concrete pool needs a permit from the town council. In Catalonia, depending on the town and the type of pool, it will be a building permit (often with a project signed by an architect or engineer) or a prior notification. Municipal taxes and fees also have to be paid and, once built, the pool is recorded in the land registry (Catastro). The most important thing is to check your council's regulations before designing it.

Building permit or prior notification

There is no single rule for the whole of Catalonia: each council decides which procedure applies to a private pool. The most common is a building permit, because a pool involves digging and building a new structure. Some towns accept a prior notification for simpler cases, and others even have a specific bylaw for private pools, such as Arenys de Munt.

So the first step is to ask the council's planning department or check its website: which procedure applies, what paperwork is required and what conditions the pool must meet.

Concrete pool with timber decking next to a modern house

What the council usually asks for

  • Site plans: where the pool goes on the plot and how far it is from the boundaries and the house.
  • Project or technical report: sizes, construction method, materials and installations. In many cases it must be signed by an architect or engineer.
  • Budget for the work: used to calculate the taxes.
  • Waste management: what will be done with the soil and rubble from the excavation.
  • Fees and taxes: the permit fee and the construction tax (ICIO), calculated on the cost of the work according to each town's bylaws.

Planning rules: distances and plot coverage

Each town's planning rules set where and how the pool can be built:

  • The minimum distance to the plot boundaries and sometimes to the house.
  • How much of the plot can be built on.
  • Whether the land is urban, part of a housing estate or rural land, where the conditions are much stricter.

Designing the pool without checking this is one of the mistakes when building a pool that causes the most delays.

Water and drought

During droughts, the Catalan government and town councils can restrict pool filling, and some towns have even temporarily suspended new permits for private pools. Before starting, it is worth checking whether any restrictions are in force in your town.

After the work: the land registry

A new pool increases the property's cadastral value and, with it, the property tax (IBI). The pool has to be recorded in the Catastro: depending on the case, the council reports it based on the permit, or the owner has to declare it. The Catastro detects undeclared pools using aerial imagery, so it is best to have everything in order from the start.

Concrete pool with a wide light stone surround next to the house

How long the paperwork takes

It depends a lot on each council and the time of year: from a few weeks to several months. That is why, if you want the pool for the summer, it is best to start the application in autumn or early winter.

What happens if you don't get a permit

  • Fines.
  • The work being stopped.
  • Having to legalise it later, at extra cost.
  • In extreme cases, demolition.

An unlicensed pool can also cause problems when selling the house.

How we help

When we build a pool, we also take care of the permit process: we tell you what your council usually requires, prepare the pool's technical documentation and coordinate the application. That way, work starts once everything is in order. More information in pool construction.

Frequently asked questions

Do I need a permit to renovate my pool?

Renovations that don't change the structure, such as a new finish, reinforced membrane or new equipment, usually need at most a notification to the council. If the shape, size or depth changes, it is processed as a new build. Either way, it is worth asking.

Does an above-ground pool need a permit?

Small removable pools usually don't. If it is large, fixed to the ground or needs building work around it, some councils do require one. It is best to check.

How much does the permit cost?

It depends on the town: the fee and the construction tax are calculated on the budget for the work using the rates each council sets in its bylaws.

Can I start work while the permit is being processed?

No. You have to wait until the permit is granted or, if it is a prior notification, until the time limits set by the council have passed. Starting early can lead to the work being stopped and a fine.

Ask us, with no obligation

At Piscinas Cardedeu we build concrete pools in the Vallès Oriental, the Maresme and part of the Vallès Occidental, and we know the procedures of the local councils. Tell us where you want to build your pool on WhatsApp at +34 640 875 468 or using the contact form. If you are working out a budget, you may find what affects the price of a concrete pool useful.